Firm Firms ABHYUDAYA By Firm Foundations and Housing Ltd
Anna Nagar
Anna Nagar West Extension Chennai
Base Price : 2 Cr +
Click for More Details
- 12200 /- per Sq.Ft.
- Size: 1345 - 1345 Sq.Ft
- 3 BHK | 1345 - 1345 Sq.Ft | 1.64 Cr
Firm Firms ABHYUDAYA - Plan Details
Bedroom(s) | Area (Sq.Ft) | Price | Contact |
---|---|---|---|
3 BHK | 1345 - 1345 Sq.Ft | 1.64 Cr Onwards | Contact |
ABout Firm Foundations and Housing Ltd
Firm Foundations and Housing Ltd
Firm Foundations has a vision to create a better future. The same can be said of any other real estate company. Where we differ is in our belief that the future depends on what we do today. Every day we think new ideas, question old beliefs, seek new challenges and innovate new methods. We do this because what we do today dictates how tomorrow turns out. The most important lesson we have learnt over the past twenty five years is that if you want a better tomorrow, begin today.
Firm Firms ABHYUDAYA - Locality Information
Save a date for your visit! If you’re interested in taking a look around, please provide us with the following details.
Firm Firms ABHYUDAYA - Amenities
Access to all amenities that give you the perfect lifestyle...
- Swimming Pool
- Jogging Track
- Indoor Games
- Community Hall
Firm Firms ABHYUDAYA - Floor Plans
Firm Firms ABHYUDAYA - Specification
R.C.C framed structure with Brick/solid block/ Cement Block walls plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Asian Premium Emulsion. Ceiling surfaces of the apartments will be given one coat of cement paint on the RCC surface and 12mm gypsum board false ceiling with galvinised iron section supports. Joint will be taped with touchup putty and finished with one coat of primer and two coats of White colour Premium Emulsion
FLOORING
Vitrified tile flooring
KITCHEN
Polished Black galaxy granite slab over cooking platform, NIRALI/ equivalent Stainless steel sink with drain board and plain glazed tiles
TOILETS
Plain ceramic tile flooring, ceramic printed/ plain tile dado
Plain ceramic antiskid tile flooring
a. Main door: First Quality Burma Teak both frame and shutters (Panel door) Polished both sides with melamine spray.
b. Other doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with teak frames, both sides polished with melamine spray. All door frames will be teak frames. Toilet doors will be painted Kassa Smart
All windows will be UPVC windows, with plain glass panels and Bright Bar grills.d.
D.Ventilator: Toilet ventilators will be with aluminium adjustable louvers with inbuilt provision for exhaust fan.
All external water supply lines and drainage lines shall be in PVC pipes.
Internal water supply lines will be in concealed CPVC pipes.
Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits
Circuit breakers will be provided
Switches will be Modular Type mounted on metal boxes from MK Wrap around
Provision for Split A/C in all bedrooms and living room
TVpoints will be provided in the master bedroom and living room
Telephone points will be provided in Living and all bedrooms
Concealed plumbing arrangements with Parryware Cascade NXT/equivalent wall mounted model White closets with tank will be provided in all bathrooms
Half turn foam flow taps and fittings MARC or Equivalent for all toilets
Each toilet shall be provided with one water closet, one wash basin, one wall mixer , a shower rose, one health faucet, pillar cock
Attached toilet will be provided
Internal walls with premium emulsion paint
External walls in emulsion paint of pleasing colour
Firm Firms ABHYUDAYA - BANK OFFERS
Firm Firms ABHYUDAYA - HOME LOAN & EMI CALCULATOR
- EMI:
- Interest:
- Total Amount Payable:
Firm Firms ABHYUDAYA - PAYMENT PLAN
-
Rs 2,00,000
Booking advance
-
20% of the value
within 15 days from the day of booking
-
30% of the value
On registration of UDS
-
10% of the value
On completion of Foundation
-
10% of the value
On completion of First floor slab
-
10% of the value
On completion of second floor slab
-
10% of the value
On completion of Brick work
-
5% of the value
On completion of tiles work
-
5% of the value
On Handover
Projects similar to Firm Firms ABHYUDAYA
Hot selling projects
Disclaimers
To our understanding, ensuring efficiency and transparency in the real estate sector is the primary objective of the Real Estate (Regulation and Development) Act, 2016. We also intend to promote the same, to the extent we can, by providing a platform to display all relevant information which is publicly available in an organized format relating to a particular property at a single place, however, at all times do keep in mind that the information that has been provided on mypropertyboutique 'the Website', including property listings, project details, location, floor, area, maps, layout etc. have been displayed for reference purposes only and cannot replace the primary source i.e. an independent verification by buyer/ agent. Any investment decisions that you take should not be based relying solely on the data that is available on the Website. Please remember it is your money which is at stake, therefore, it is advisable that any decisions that are taken to invest in any real estate are taken after researching the bonafides of the person/entity selling the same to you including title of such property.